LOCATIONS
Power-Driven Infrastructure Built at Scale
We develop and operate data centers with direct access to grid-supplied power, strategic locations, and infrastructure designed for the most advanced computing.
OUR APPROACH
Power-First Strategy
While most data center developers begin with land and work backward to secure power, we start with power and build forward. Our sites are anchored by large-scale power interconnections ready to scale with speed and discipline.
OUR FOOTPRINT
Strategically Located Across Key Energy Markets
Explore Our Campuses
Hover over a location on the map to see campus details.
CORSICANA, TEXAS
Corsicana
Our Corsicana campus is one of the largest single-site data center developments in North America. Strategically located in the ERCOT market with direct access to 1 GW of high-voltage capacity.
1 GW
Total Capacity
958
Acres
ROCKDALE, TEXAS
Rockdale
Our flagship site features 700 MW of developed capacity, supporting large-scale Bitcoin mining and data center operations across seven buildings.
ㅤ
700 MW
Total Capacity
200
Acres
PADUCAH, KENTUCKY
Kentucky
Our Kentucky operations expand our geographic footprint with 300 MW of reliable capacity across two facilities. Air-cooled sites support Bitcoin mining operations with low-cost power.
300 MW
Total Capacity
150
Acres
WHY RIOT
What Sets Us Apart
Power at Scale
Power is the foundation of our strategy. With 2.0 GW of fully approved power in attractive markets, we are positioned to meet the rising demand of AI & High-Performance Compute.
Speed to Market
Approved power, existing infrastructure, and retrofit opportunities at key sites allow us to move faster than competitors starting from the ground up.
In-House Engineering
Through ESS Metron and E4A Solutions, we bring critical engineering, electrical manufacturing, and power deployment capabilities in-house. These teams strengthen execution and long-term operations.


